Biomimetics and Dextrous Manipulation Lab

HomePage

New Honda Project: Transmission with Gecko-Inspired Adhesives

Starting: 22 January 2018

Possible schedule for mold and gecko adhesive manufacturing: (Googledoc)

Possible sub-topics:

  • gecko adhesive manufacturing processes
  • transmission concepts
  • preliminary test results

Attach:Introduction_Honda.ppt

Link to attach Kapton to tile: Main.CastingFlexibleAdhesives

This page will provide:

Logistics

  • An introduction to the project
    • Group members: Mark Cutkosky, Capella Kerst, Elliot Hawkes, Arul Suresh
    • Step 1 Research Duration Jan 2018
      • Important Check Points are

older stuff from previous Honda project...


This page will provide:

Logistics

           -- Updated 13/5/2013 by Atsuo Orita(Honda confidential)

Reporting Documentations

4March2014Reporting

Meetings

There are a couple of possible mutually convenient meeting times:

  1. Option1: 07:00 Tokyo/ 14:00 SFO/23:00 Pisa (or 06:45 Tokyo/ 13:45 SFO/22:45 Pisa)
  2. Option2:15:00 Tokyo/23:00 SFO/08:00 Pisa (or 15:45 Tokyo/ 22:45 SFO/07:45 Pisa)

Attach:Introduction_Honda Δ

Notes:

Page last modified on January 23, 2018, at 01:51 pm