Whisker Assembly Protocol

1. Whisker Installation
- Trim the whisker base for better fitting
- Adjust nitinol wire length with proper insertion margin
- Insert whisker through both holes in the 3D-printed base
- Ensure whisker's wide surface parallel to grooved bridge
2. FBG Fiber Preparation
- Measure required length:
- Position FBG black marks between bridge grooves
- Measure from opposite end of grooved bridge
- Cut fiber at measured length
- Insert FBG into protective tube
- Add compensation tube to green end
- Note: If forgotten, tube can be cut and glued later
3. Adhesive Application
- PPE Required: S-size gloves + mask
- Apply adhesive followed by immediate curing agent
- Key bonding points:
- FBG marks near groove end
- Bridge groove (another one)
- Whisker mounting points (both sides)
- Compensation tube junction (~compensation tube near the green end)
- Allow 5 min cooling after completion
Critical Notes:
- Select correct FBG wavelength
- Handle fiber with extreme care to prevent breakage
- Use minimal adhesive at all points (particularly the first two)
- Expect significant heat generation during curing
Signal Acquisition Test
Setup
- Navigate to `whisker` directory
- Execute Python script (use ↑ to recall previous command)
* Typical command: `mode=plot`
Data Visualization
- Real-time signal monitoring:
* Time-domain response
* Frequency spectrum analysis
Test Method
- Apply manual excitation to whisker
- Observe dynamic response in both plots
Page last modified on June 29, 2025, at 03:09 pm

